We stripped the roof back to the rafters so the ageing roofing layers could be removed and the roof rebuilt properly. New breathable membrane and new pressure-treated battens were then installed before the existing roof tiles were cleaned, prepared and re-laid.
This approach renewed the underlying roofing system while allowing suitable existing tiles to be retained rather than automatically replacing the complete visible roof covering.